Fennell Campus Renewal Project

Icon

A New Mohawk for a New Decade

Renovations Update

This slideshow requires JavaScript.

Since classes ended in April, we’ve been working hard to bring about the kind of transformation that students and staff told us they want to see at Fennell Campus.   We’ve made tremendous progress towards creating a great learning environment for students.

One of the most dramatic changes will be found in the C-Wing between E and I-Wings.

Through the expansion of this space we were able to create a significant “Learning Hub.”

The area will be wireless and provide students with places to gather, work or collaborate on projects with faculty or classmates. In this area, students and staff will also find Learning Hubs and peer tutoring services.  The new Learning Hubs will offer more computers and will aim to support information, technology and media literacy for Mohawk students.

Academic Districts

One of the objectives of the Fennell Campus Renewal is to create “academic districts” or schools. The first wing to undergo consolidation is the A-Wing, which has become the School of Human Services.  This summer, we enhanced the A-Wing’s main level corridor and classrooms to accommodate the schools requirements.

Preparations are also under way to accommodate a consolidated testing centre in A-Wing.

Cafeteria

Renovations to an expanded cafeteria are progressing rapidly and are expected to continue throughout September.  The new cafeteria will feature new food concepts, a variety of seating areas and a more efficient system of payment.

Filed under: Construction Updates , , , , , , , ,

Behind the scenes tour of Mohawk College’s Fennell Renewal Project

On time, on budget, and most importantly accident free.

Mohawk Students’ Association President Kat Cullen offers this behind the scenes tour of the new Centre for Entrepreneurship, Learning and Innovation.

The Centre will house the new, state-of-the art Harold Cummings Library, 7 classrooms, all with the latest in wireless, multi-media technology, video conferencing and Media Productions Studios, and will feature a Learning Hub on the upper level.

The Centre for Entrepreneurship, Learning and Innovation will be LEED Gold Certified — one of the greenest education buildings in the region.

Please view the video for more about the new Centre for Entrepreneurship and Innovation.

The video, shot and edited by Mohawk students Zachary Cowley and Carrie-Anne Shearer, debuted at the 2010 Mohawk President’s Breakfast.

Filed under: Construction Updates, Media, Mohawk Students Association, Video , , , , ,

The new building is taking form

You have to see it to believe it. The new building is taking form. Check out our Flickr page for the latest construction photos.

Filed under: Construction Updates

Touring the new Mohawk Centre for Entrepreneurship, Learning and Innovation

On time. On budget. And accident free. The new front door and public face for Mohawk College is scheduled to open this Fall. The Mohawk Centre for Entrepreneurship, Learning and Innovation at the Fennell Campus will be home to a new library and learning commons and multi-media classrooms. The current library at the Fennell Campus will be converted into a new one-stop centre for student services. Mohawk President Rob MacIsaac recently led community leaders on a behind-the-scenes tour of the centre.  Pictured above is a second story view of the Centre. (Photo by Simon Wilson)

Filed under: Uncategorized

Renewal Update: #7

This is to notify occupants that the contractors will be working in your space during the week of

June 28, 2010 after 10:00 p.m. as specified:

Date Room
28-Jun C115B
28-Jun C115E
28-Jun C115A
28-Jun C115D
28-Jun C115
28-Jun C113A
28-Jun C113F
29-Jun C113
29-Jun C111
29-Jun C111
29-Jun C111A
29-Jun C109
29-Jun C109K
29-Jun C109K
30-Jun Corridor outside C110C
30-Jun Corridor outside C108CA
30-Jun C108C
30-Jun C102C
30-Jun C121
30-Jun C123
30-Jun C125

We will ask that you try to minimize the amount of paper and clutter on your desk and in your office. We will cover furniture with plastic sheets but also need to have space to position ladders. All fragile items should be stored if there is any danger of knocking them off a shelf or desk.

If you have any concerns or questions please contact Morris Iafrate at 416-809-8694. We apologize in advance for any inconvenience and thank you for your cooperation.

Ron Baskin : Chief Building & Facilities Officer
Tony Scime : Facilities Manager

Morris Iafrate: Senior Energy Engineer, MCW

Filed under: Uncategorized

Renewal Update: #6

Facilities Management are about to start one of the final phases of a 3 year Energy Efficiency Upgrade at the Fennell Campus. This phase will benefit those using “C” wing classrooms and staff with offices in “C” wing. We hope to enhance heating and cooling control with new VAV boxes which currently reside in the ceiling space above your office or classroom and add Direct Digital Control of these pieces of equipment to the Building Automation System which is centrally controlled from a computer in the Boiler Room. As the equipment we need to access and renew is in your work space, contractors will be entering your office after 6:00 p.m. to perform work.

This work will occur in two phases:

1. Preparation of existing HVAC components (May-June)

2. Installation of new VAV Terminals and Controls (June-July)

This is to notify occupants that the contractors will be working in your space during the week of

June 21 to June 23, 2010 after 10:00 p.m. as specified:

Date Room
21-Jun C115A
21-Jun C115B
21-Jun C115E
22-Jun C115
22-Jun C115D
22-Jun C113F
23-Jun C113C
23-Jun C113A

We will ask that you try to minimize the amount of paper and clutter on your desk and in your office. We will cover furniture with plastic sheets but also need to have space to position ladders. All fragile items should be stored if there is any danger of knocking them off a shelf or desk.

If you have any concerns or questions please contact Morris Iafrate at 416-809-8694. We apologize in advance for any inconvenience and thank you for your cooperation.

Ron Baskin : Chief Building & Facilities Officer
Tony Scime : Facilities Manager

Morris Iafrate: Senior Energy Engineer, MCW

Filed under: Construction Updates

We’re on Facebook and Twitter and We want to meet you!

The Fennell Campus Renewal Project has found two new homes: Facebook, and Twitter and

we hope to meet you there. Feel free to send us your tweets,  post on our wall, send us messages or just have a look around. 

We look forward to meeting you!

Filed under: Social Media

Renewal Update: #5

ATTENTION – Facilities Management has scheduled the
following dates and times for Electrical Shut Down for Maintenance:

Fennell Campus – July 17, 20106:00 a.m.-6:00 p.m.
Stoney Creek Campus – August 21, 2010 6:00 a.m.-6:00 p.m.
Brantford Transformer – July 3, 20106:00 a.m. Start
Brantford Campuses – July 10, 20106:00 a.m.-6:00 p.m.

If you have any questions, please contact Tony Scime,  (905) 575-2269 ext. 2269.

Filed under: Construction Updates

Renewal Update: #4

 

Facilities Management are about to start one of the final phases of a 3 year Energy Efficiency Upgrade at the Fennell Campus.

This phase will benefit those using “C” wing classrooms and staff with offices in “C” wing. We hope to enhance heating and cooling control with new VAV boxes which currently reside in the ceiling space above your office or classroom and add Direct Digital Control of these pieces of equipment to the Building Automation System which is centrally  controlled from a computer in the Boiler Room.
As the equipment we need to access and renew is in your work space, contractors will be entering your office at night after 6:00pm to perform work during the months of June, July and Aug. A more detailed schedule of work is being developed and as we proceed through the project, you will be notified a few days in advance. It is our hope that you will not notice we worked in your area when you report to work the next day.
We will ask that you try to minimize the amount of paper and clutter on your desk and in your office. We will cover furniture with plastic sheets but also need to have space to position ladders. All fragile items should be stored if there is any danger of knocking them off a shelf or desk.
You may direct any questions to Ron Baskin  or Tony Scime  

    Ron Baskin 
    Executive Director, Facilities Management 
    Fennell Campus, Room B101J 
    Telephone: (905) 575-2243 | Fax: (905) 575-2304 
    E-mail: Ron Baskin

    Tony Scime 
    Manager, Mechanical & Electrical 
    Fennell Campus, Room B101H 
    Telephone: (905) 575-2269 
    Fax: (905) 575-2304 
    E-mail: Tony Scime

Filed under: Construction Updates

Renewal Update: #3

 

 The Information Technology Service Desk is now temporarily located on the 2nd Floor of the Fennell Campus Library.

Student and General Staff Services include:
* Walk-in IT support, i.e. MoCoMotion, e-mail and Network Accounts, Wireless Access, General IT Inquiries
* Laptop and Audio-visual equipment loan-out available for course assignments and development only
* Plotter and Colour Printing
* Student Print Card assistance

Faculty Services include:
* Scantron Objective Test Scoring
* Smart Classroom and Lab Key loan-out

Hours of Operation:
* Monday to Thursday: 7:30 a.m. to 10:00 p.m.
* Friday: 7:30 a.m. to 4:30 p.m.
* Saturday: 8:30 a.m. to 1:00 p.m.

Telephone:
* 905-575-2199, press Option 3
* Toll Free 1-866-601-8445

    With construction moving forward on the Campus Renewal Project, access to computers

     at Fennell Campus is available:
    * in the Library, Room C102
    * in the e-Library in i-wing — with user assistance available.

For Library summer hours, please check the Brain at:
http://brain.mohawkcollege.ca/AbouttheLibrary/Hours.html

Computers are also available in the MCACES Lounge, Room F114:
http://www2.mohawkcollege.ca/dept/stactiv/mcaces/services.html

Cards to access the College printing system may be purchased from the Print Card Machine located in the lobby across from the McIntyre Theatre by the College Security Services Office C103.

———————————————-
Information Technology Division
Service Desk, ext. 2199

Filed under: Construction Updates